Training run at base of Mt Meru, Tanzania

Altitude (m)
2000
Temperature (C)
35
Pack weight (kg)
7

Great training run. Testing equipment, shoes, suit, food water.
Accompanied by two amazing Tanzanian athletes.
Alt ~ 2000m
Temp ~ 35°C
Wind at my back.
Terrain - Hilly
Pack weight ~ 7kg
First 30kms flew by.
Masaai - "thank you for coming so far to exercise with us."

Leave a Reply

Your email address will not be published. Required fields are marked *